All servicesFire protection system designFire detection and alarmFire suppression systemsSystem maintenanceOther systemsPassive fire protectionContacts
About the system

Fire protection for air ducts in Kyiv and Ukraine

We select a fire protection build-up for ductwork according to the design, network configuration and actual access to installation areas.

KABO GROUP reviews the available information, prepares an agreed technical scope and completes the work with the defined documentation.

Solutions

What is included in fire protection for air ducts

Practical guide

System details and solution selection

How the solution is selected

We assess the building use, protected area, fire risks, existing engineering services and the required performance before agreeing the technical solution.

What affects scope and cost

The estimate reflects system size, equipment or materials, access conditions, interfaces, commissioning and the completion documents agreed for the project.

From survey to handover

KABO GROUP can survey, design, supply, install, test and hand over the system, followed by planned maintenance where required.

Quality control and handover

During application we record material batches, substrate preparation, ambient conditions, consumption and intermediate measurements. Coatings are checked for thickness, continuity and adhesion; boards and penetration seals are checked as complete tested assemblies.

Handover may include work records, concealed-work records, area drawings, inspection protocols, material documentation and maintenance guidance. The exact package is agreed in the contract and design.

The duct as a complete fire-resisting system

Duct fire resistance depends on the complete assembly, not only the material on flat surfaces: sheet metal, flanges, joints, fittings, hangers, fixings, penetrations and protection method all matter.

The design defines fire-resistance class, duct purpose, exposure direction and permitted system configuration. Unverified changes to mat thickness, fixings or joint treatment may invalidate the classified solution.

Details, hangers and inspection access

Dampers, access panels, wall and floor crossings, transitions, branches and hangers are detailed separately. These locations often determine real system quality and must remain accessible for installation and inspection.

Before enclosure, continuity, thickness or layer count, fixing spacing, joint treatment and route compliance are checked and recorded as concealed work and as-built information.

Regulatory basis

Regulations and standards considered

This list explains the regulatory basis but is not a substitute for a project or a complete schedule for every building. Document status, amendments and building-specific requirements are verified when the project starts.

AMMOKOTE / VIDEO

See passive fire protection in action

Official manufacturer videos demonstrate preparation, installation and material behaviour under flame exposure.

All channel videos
Real project

Вогнезахист металевих конструкцій

A real 20,000+ m² project using several Ammokote systems under client supervision.

Open on YouTube
Installation method

Універсальна кабельна проходка Ammokote SCS-K

System components and the installation sequence for a fire-resistant cable penetration.

Open on YouTube

Videos are provided by the official Ammokote fire-protection materials channel. The project defines the applicable system and coating thickness.

Outcome

One accountable delivery cycle

Review of junction detailsSystem selectionInstallation of coating or enclosureCompletion records
Process

Work stages

Project information

We receive drawings, specifications, fire-resistance requirements and available information about the site.

Site survey

We verify the actual condition, geometry, access and preparation requirements.

Technical solution

We select a compatible fireproofing system and define the required scope.

Estimate and schedule

We agree materials, quantities, site conditions, responsibilities and timing.

FAQ

Common questions

Can you work with complex duct geometry?+

Yes, after reviewing joints, hangers, intersections and actual site access.

How does the work begin?+

We start with the available information, a site survey and an agreed technical brief.

What determines the cost?+

Cost depends on floor area, building configuration, system scope, access conditions and the required completion documents.

Short request

Request a preliminary estimate

By submitting, you agree to data processing for the purpose of answering your request.